PROJECTS (mouse-over pic for precis; click for full report if boxed)

Commercial buildings Strata buildings Civil & marine structures

Building on a busy intersection complicated materials handling, debris removal and deliveries; and a parapet wall was over a bus stop.Major concrete repairs and roof membrane

Keywords: concrete repair,waterproofing, protecttive coating, difficult access

Severe deterioration of the brickwork mortar bed due to poor quality control over the mortar mix originally called into question the brickwork's structural adequacy.Brick facade strengthened and upgraded

Keywords: brick ties, brick repointing, concrete repair, projectie coating, rendering repairs, waterproof membrane, terrace repair, rescreeding, retiling

Years of chloride ingress into the concrete structure had caused severe deterioration of various elements of the wharf.Watsons Bay ferry wharf receives overdue repair

Keywords: install access system, repair concrete, repair marine structure, repair wharf, form and pour, construct with environment safeguards

The Kent Street facade was deemed beyond repair, and high chloride profiles and carbonation attack were found in other facade elements. Major spalling was occurring to window heads and sills.Major face-lift for city building

Keywords: concrete repair, sacrifial anodes, protecttive coating, joint sealing, install access systems, repair window head and sill, precast concrete facade

Elements of the western elevation had not been adequately repaired causing leaking windows and
corroding lintels, leading to damage to internal fixtures and fittings.Stage 2 residential facade repair and restoration

Keywords: repair concrete, repair brickwork, strengthen brickwork, lead paint removal, protective membrane, facade repair, lintel repair

Existing joints in the dam wall were allowing water to seep inside the wall and particularly into a chamber area where electrical equipment was installed.Rope access team repairs joints and seals dam wall

Keywords: repair dam wall, rope access, repair concrete, seal joints, safeguard structure repairers

Exposed aggregate render, reinforced by
a thin mesh, was delaminating from the concrete.Restoration of failing exposed aggregate render

Keywords: inaccessible building repair, restricted building repair, constrained building repair, time-limited building repair, noise-constrained building repair, reinstatement of architectural render, repair of occupied buildings

The building, with rendered brickwork
and timber framed windows, was suffering from severe deterioration due to its proximity to the ocean.Residential beach facade gets repaired and protected

Keywords: render repair, brickwork repair, brick tie replacement, lintel repair, window installation in high-rise, protective coating, inaccessible building repair, restricted building repair, constrained building repair, repair of occupied buildings

Large scale deterioration of the concrete in the lower half of all walls within the 80 m long culvert. Corrosion was driven by high levels of carbonation and low concrete cover. The constraints: The culvert was subject to flooding and also strict EPA guidelines were to be adhered to.Site team repairs and gives long-life protection to four cell culvert

Keywords:repair concrete, protective coat structure, hydrodemolition, guniting, safeguard structure repairers, repair culvert, construct with environment safeguards

Repair of coating and concrete deterioration had to be undertaken mostly from the building maintenance unit with the building fully occupied requiring strict adherence to safety, security and noise control standards.Harbour-side tower building gets protection

Keywords: repair high-rise, protective coat building, repair concrete

Repair of windows and lintels above a very narrow street and power lines, the footpath too narrow to erect hoarding, the work team  allowed no car spaces, and the building to remain fully occupied: all were constraints to be overcome.Inner city facade repaired and restored

Keywords: repair concrete, repair brickwork, strengthen brickwork, lead paint removal, protective membrane, facade repair, lintel repair, inaccessible building repair, restricted building repair, constrained building repair, repair of occupied buildings

Close to Homebush, we have also just completed a smaller repair project, although for our valued clients there really is never a project too small. Initial work involved suitably preparing the damaged steps to this very steep pedestrian bridge over the Parramatta River. Stainless steel pins were inserted into predrilled holes and epoxied in. Finally, a high strength polymer modified repair mortar was used to reinstate the treads and nosings of the steps on both sides of the bridge.Bridge

Keywords: repair concrete

In addition to this building facing a change of function, its heritage facade was in a serious state of disrepair, having suffered the ravages of time, pollutants and previous construction damage. The building was fully occupied with some high security tenants.Teamwork restores magnificent heritage facade

Keywords: restore heritage facade, repair brickwork, stitch cracks, repair concrete, protective coat building, install Helibar

Major waterproofing and tiling issues with the penthouse terraces of the building. In addition, the brick parapet wall required structural strengthening.Terraces upgraded in heritage building

Keywords:torch on membrane, screed and tile, material hoist to roof, repair brickwork, install Helibar

 

The existing roof of the heritage building urgently required a new membrane system. At the same time the existing plant room structure was to be extended. All works had to be undertaken before the removal of a tower crane.New plant room and floating membrane system

Keywords: torch on membrane, remedial fire protection and air conditioning

The existing roof membrane, which was spread over four distinct roof areas at different heights, had reached its use-by date and needed upgrading.Team waterproofs high-rise overlooking Manly

Keywords: torch on membrane, mechanical pressure seal, build new hob, cap hob, screed and tile, material hoist to roof, safeguard building workers, waterproof roof

 

The 20 year old membrane system was failing, allowing water to leak into the building. The Preservation Technologies team undertook a trial membrane prior to project start to validate the strategy. The team erected...A new roof torched on solves leaks in data centre

Keywords: torch on membrane, waterproof roof

Sitting high over The Rocks, the Harbour Bridge and Opera House, this prestigious hotel and apartment building had been subjected to the usual mechanisms of coating deterioration for over ten years. The owners had Bellmont Facade Engineering inspect the building for defects, and provide a specification for repair and protection. The inspection found some concrete deterioration and failure of the coating.Exclusive apartments undergo big terrace upgrade

Keywords:torch on membrane, screed and tile, material hoist to roof, repair brickwork, install Helibar

 

Major concrete repairs, roof membrane and landscaping in tough location

Keywords:torch on membrane

 

Salt ingress to external concrete and masonry elements caused corrosion of structural steel. Original masonry balustrades obstructed ocean views and their removal offered the opportunity to raise the overall look of the building and boost property values.Beachside apartments revitalised including CP installation

Keywords: repair concrete, protective coat building, cathodic protection, screed and tile, stainless steel balustrade, treat steel corrosion, build new hob

 

 

Work has been completed on the refurbishment of three Heritage houses situated in Homebush. The houses are part of the SOPA asset base and have been unoccupied due to large scale cracking to both internal and external walls. Along with major landscaping works to stabilise the ground around each house, the cracking was repaired using Helifix bars installed to strengthen the walls. In addition bricks had to be removed, matched and replaced and articulated joints were installed in a number of areas most notably to an arch in Building 123.Heritage houses

Keywords: repair brickwork, stitch cracks, install Helibar, detail articulated joints, repoint brickwork